Construction Waste Bin Rental
On an active site, the bin schedule is part of the build schedule. A full bin nobody can empty stops trades from working, and an empty bin sitting for a week is money parked in a driveway.
We plan construction bins around your trade sequence: drop date, expected fill rate and swap dates agreed before the first delivery.
What's included
- Framing offcuts, sheathing and engineered lumber
- Demolition debris and site clean-up
- Packaging, banding and jobsite waste
- Scheduled swap-outs for multi-phase builds
Most-booked bin for this job
20 Yard Bin — $600
3 tons included · Approx. 16 ft long × 7.5 ft wide × 5 ft high
Compare bin sizesHow the construction waste runs
- 1
Share the schedule
Trade sequence and site access window determine drop and swap dates.
- 2
Place for the loader
We position bins so equipment can load without repositioning.
- 3
Swap on schedule
Agreed swap dates keep the site clear and the crew working.
- 4
Final clean-up bin
Book the last drop for finishing-stage packaging and offcuts.
Book your construction waste
Flat rate, tonnage included, dispatched from inside the GTA.
Construction Waste FAQs
The questions we get asked most on this type of job.